01 · Priority projectTuzly-25 hybrid solar plant
Build a 25 MW solar plant with a 5 MW / 10 MWh battery system to strengthen power supply for public services and residents
More about this project
Blackouts and rising energy costs put pressure on essential services. The Tuzly-25 proposal focuses on decentralised generation and storage for public institutions, critical infrastructure and residents
The project combines a solar plant with a battery energy-storage system and connection to the electricity network
The aim is more stable electricity supply, reduced grid dependence and lower associated emissions. The approved portfolio sets out the generation and storage capacities, investment estimate and current preparation stage